Frequently Asked Questions (FAQs)

How long does the solar installation take to finish?

Solar System, Inc. works hard to finish your installation in as little as 3-6 weeks. This includes the initial site visit, engineering plans, permit issuance, installation, and permission to operate (PTO) from your local utility. Throughout this process, we will keep you updated on the project schedule.

How long does it take to interconnect my solar system to the local utility?

If no third party leasing is involved in your financing (you are paying cash or are taking out a personal loan), Solar System, Inc. can expedit this process in 3-4 weeks.

What happens when the power goes out?

Your solar system is connected to the local utility grid. This means you will always have access to power as well as the ability to put power to the grid. If the power goes out, so does the power produced from your solar system. You solar system will turn back on once the power is restored.

What is Federal Tax Credit and how does it apply to my solar system?

The federal tax credit is available until December 31 of 2019. This is a 30% credit that can be applied to if you have